Back to trainsThimbiriyagedara to Batuwatta
Batuwatta to Thimbiriyagedara Train Timetable
Connecting trains
No direct trains run Batuwatta to Thimbiriyagedara — these need one change.
- 2h 53m1 change at Ambeypussa
- 6:08 PMBatuwatta7:11 PMAmbeypussa8362-1173
- 13m wait at Ambeypussa
- 7:24 PMAmbeypussa9:01 PMThimbiriyagedara4470